A BOQ is a plan. The useful question during construction is how the real project compares with it. That comparison is variance analysis.
What Variance Means
Variance is the difference between a planned figure and an actual one. A positive or negative sign only matters in context: using less material than planned is good if the work is complete to specification, and a warning if the work is behind.
The Three Variances Worth Tracking
| Variance | Compares | Typical cause |
|---|---|---|
| Quantity | BOQ quantity vs quantity actually executed | Scope change, re-measurement, rework |
| Material | BOM quantity vs material consumed | Wastage, theft, poor estimates, wrong mix |
| Cost | Budgeted amount vs amount spent | Rate changes, overtime, unplanned purchases |
A Worked Example
| Planned (BOM) | Consumed | Variance | Percent |
|---|---|---|---|
| 100 bags | 118 bags | +18 bags | +18% |
An 18% overrun on one material, found at month end, is hard to correct. Found in week two, it is a conversation with the site engineer about mix ratios and wastage.
Acting on a Variance
- Decide a threshold. For example, flag anything beyond a set percentage over plan.
- Find the cause. Is it wastage, a real change in scope, or a bad estimate?
- Fix the process or the plan. Tighten site controls, or revise the BOQ through approval if the scope has truly changed.
- Review regularly. Weekly beats monthly.
Why Excel Struggles Here
Variance needs planned and actual figures in one place, updated as work happens. When consumption sits in tally sheets and the plan sits in a separate workbook, reconciliation becomes a month-end chore. See our guides on material tracking and budget management.
VISWOX ERP includes variance alerts, so a gap between plan and actual is flagged as it appears.
Summary
- Track quantity, material and cost variance against the BOQ and BOM.
- Set thresholds and review weekly.
- Find the cause before deciding whether to fix the site or the plan.
See Variance Before It Becomes Loss
VISWOX ERP includes variance alerts that compare planned and actual figures, so overruns surface while there is still time to act.